Infrastructure

 

STATUS OF INFRASTRUCTURE IN JNV’S

 

I

Area of land  allotted (in acres)

Whether land transferred in the Name of Samiti

Vidyalaya shifted to permanent buildings on 

:  33 Acrs – Kharsa No. - 747

:  Yes,     Date of Transfer - 1987

 

:  1996

 

ii

Status of Boundary Wall

a.  Brick Wall

b.  Barbed wire fencing

: (Completed / Incomplete)

:  Completed

:  Completed

 

iii

Permanent buildings constructed

: (CBRI pattern/ CPWD pattern)

Yes : CBRI & CPWD PATTERN.

 

iv

School building

:  Completed

 

v

Dormitories

:  Boys _____04______ Nos.- 320 Capacity

   with Warden Residence__02____ Nos.

Boys – 01 – 96 Capacity

 

 

 

:  Girls ______02________ Nos.- 160 Capacity

   with Warden Residence__02____ Nos.

 

vi

Kitchen/dining Hall

 

No. of shifts required for all students  to take food

:  Complete / not complete, Area __2658 Sqm._

One Kitchen/ Dining Hall , Two Shifts Completed, One Dining Hall Sanctioned Construction yet to be Started. _____

 

vii

Principal Residence

:  _01__ No.

 

viii

Staff Quarters

 

 

 

 

: Type III = __12____ Nos.

  Type II = ___12____ Nos.

  Type  I  = ___12____ Nos.

  SP Sheds converted into Staff Qrs.:__-__ Nos.

 

ix

M.P. Hall

:  Available

x

Workshop

: Available

xi

Type of O.H. Tank

Its capacity

Present Status

 

:  Column based

:  __1,35000___ litres

: Working satisfactory / not satisfactory

Not Handedover and Not Functioning since the inception of the Vidyalaya due to cracks in the structure

xii

U.G. tank

Its capacity

Present Status

:  __1,35,000_____ litres

: Working satisfactory

xiii

D.G. Set

 

 

 

 

:  Available

: ___Kirlosker __________ make

:   __15____ KV

25 KVA G Set is yet to be installed. 

: Working

: Year of procurement - 2006

xiv

Sewage Pump

: ___3.5_ H.P.

xv

Water Pump 

: ____5.5_H.P.___

xvi

Electrification 

Electric connection

Sub Station building

Street lighting

Numbers of hrs. during day when power supply is available on an average.

 :  Rural  Feeder

:  Completed

: ___42_______ Nos. of Poles

: _____04___ hrs.

xvii

Playfields

400 metre track

40 x 30 metre basket ball court

40 x 30 metre volley ball court

: Available

:  _______Nos.   – Not available

:  ___01____Nos.   – Available

xviii

Water supply

Tube Well

Hand pump

Connection from PHED

Yes

: Potable,  __01__ Nos.-  working

: Potable, __04__ Nos.-  Working

:  ___-___ hours supply in a day

xix

Rajiv Gandhi Smriti Van

:  Available

xx

Fire fighting arrangement

:  Working

xxi

Last date of cleaning of

(a)   Septic tank

(b)   Water tanks

 

: 25.05.2008

: 13.04.2008

xxii

Whether area around transformer is fenced

:  Yes 

xxiii

Whether open wells, if any, are covered from top

:   Yes / No  ( Not Applicable )

xxiv

Works taken up under M&R fund during current year and last year:-

 

: - 2011-12

Compulsory annual maintenance and repair works are in progress.

Year

Name of work  (M&R)

Expenditure

(Rs. In lacs)

Cumulative expenditure during the year

 

Elec , Civil Work

4.71